福清核電時鐘系統可靠性研究與提升
  • 企業:     領域:嵌入式系統    
  • 點擊數:1699     發布時間:2019-12-31 11:45:48
  • 分享到:

作者:趙穎(福建福清核電有限公司,福建 福州 350300)

摘要:福清核電全廠時鐘系統作為電廠的授時母鐘,為涉網電氣系統、全廠DCS系統、汽輪機P320控制系統等重要電氣、儀控自動控制設備提供時鐘基準信號授時,其可靠性對電廠自動控制系統的安全穩定運行有著重要的意義。本文以福清核電時鐘系統為主線,介紹福清核電1~4號機組時鐘系統結構,時鐘系統投用后,先后多次由于時鐘信號錯誤導致DCS控制系統二層出現不同程度故障事件,根據運行技術規范要求,機組被迫由KIC模式切換到BUP模式運行,甚至降功率運行,嚴重危及機組的安全。通過對事件原因進行深入分析研究,找出時鐘設備、系統固有缺陷,提出優化改進措施,提高時鐘系統運行可靠性。針對“華龍一號”5/6號機組的時鐘系統,系統在供電、檢測控制模塊、校時、時鐘檢測等方面均有較大提升與改進,以保證對控制系統授時可靠性。最后對福清核電全廠的時鐘系統進行期望性的規劃,其可為各系統提供最精準的時鐘基準信號,保障機組安全穩定運行,為后續核電機組設計、調試、運維提供重要參考經驗。

關鍵詞:時鐘;可靠性;DCS

Abstract: Fuqing Nuclear Power Plant's clock system is used as the master clock for power plants. It provides clock reference signals for important electrical and instrumentation automatic control equipment such as network-related electrical systems, plant-wide DCS systems,and turbine P320 control systems. The safe and stable operation of the system is of great significance. Based on Fuqing nuclear power clock system as the main line, this paper introduces clock system structure of Fuqing nuclear power unit 1-4. After the clock system is putting-in-service proactively, multiple levels of fault events occur in the second layer of the DCS control system due to clock signal errors.According to the operating technical specifications It is required that the unit be forced to switch from KIC mode to BUP mode and even run at reduced power, which seriously endangers the safety of the unit.Through in-depth analysis and research on the causes of the event,the inherent defects of the clock equipment and system are found out,and optimization and improvement measures are proposed to improve the operating reliability of the clock system. As for the clock system of “Hualong No.1” unit 5/6 in the power supply, control module, the school, the clock have significant improvement to ensure the reliability of timing control system. Finally, the clock system of the entire Fuqing nuclear power plant is expected to be planned, which can be for the system to provide the most accurate clock reference signal, guarantee the safe and stable operation of unit, and provide important reference experience for subsequent nuclear power units provide a valuable reference for design, commissioning, operation and maintenance..

Key words: The clock; Reliability; DCS

在線預覽:福清核電時鐘系統可靠性研究與提升

摘自《自動化博覽》2019年12月刊

熱點新聞

推薦產品

x
  • 在線反饋
1.我有以下需求:



2.詳細的需求:
姓名:
單位:
電話:
郵件:
主站蜘蛛池模板: 亚洲精品综合久久中文字幕 | 日韩a一级欧美一级在线播放 | 在线观看精品视频 | 97公开视频 | 欧美一级毛片欧美一级 | 久久不色| 97国产在线播放 | 九九九热视频 | 免费的一级片网站 | 久久精品视频99精品视频150 | 日韩美女视频在线观看 | 美女张开双腿让男人桶 | 一级做a爱过程免费观看 | 成人中文字幕一区二区三区 | 最新国产中文字幕 | 国产亚洲精品网站 | 成人性欧美丨区二区三区 | 欧美亚洲欧美区 | 久久免费小视频 | 中文字幕在线视频网站 | 欧美人成a视频www | 国产一级一片免费播放刺激 | 欧美激情视频一区二区免费 | 国产日韩欧美网站 | 日韩成人黄色片 | 欧美成人综合在线观看视频 | 国产91精品久久久久久久 | 亚欧视频在线观看 | 久久成人综合网 | 国产东北色老头老太性视频 | 成人精品视频一区二区三区 | 日日摸天天摸狠狠摸视频 | 亚洲人成亚洲人成在线观看 | 中文在线视频 | 午夜精品网 | 欧美日韩无 | 国产精品1区2区3区 国产精品1区2区3区在线播放 | 美女国产在线观看免费观看 | 欧美亚洲国产片在线观看 | 天天欲色成人综合网站 | 久久精品免视国产 |