郭旭東,齊敏,宋玉霞 ★北京廣利核系統(tǒng)工程有限公司
摘要:當前國內(nèi)核電機組的DCS驗證采用工廠測試和現(xiàn)場調(diào)試獨立策劃 的方式,國外三代核電(如EPR、AP1000等)的DCS系統(tǒng)采用工廠測試 與現(xiàn)場調(diào)試總體策劃的測試模式。本文借鑒EPR、AP1000的整體策劃實 踐,通過對核電DCS系統(tǒng)工廠測試與現(xiàn)場調(diào)試邏輯功能驗證方案進行對 比分析和研究,找出差異,為核電DCS系統(tǒng)工廠測試與現(xiàn)場調(diào)試全范圍 功能測試實施打下基礎,有利于核電DCS系統(tǒng)工廠測試、現(xiàn)場調(diào)試的優(yōu) 化和質(zhì)量提升,從而控制工期和成本。
關鍵詞:核電;DCS;邏輯;測試
Abstract: At present, the DCS verification of domestic nuclear power units is planned independently by DCS factory test and nuclear power factory debugging. The DCS system of three generations of foreign nuclear power plants (such as EPR, AP1000, etc.) adopts the test mode of overall plan of factory test and nuclear power factory debugging. Based on the overall planning practice of EPR, AP1000, this paper compares and analyzes the verification scheme of logic function between plant test and field debugging of nuclear DCS system, finds out the difference and lays a foundation for the implementation of fullrange functional test of nuclear power DCS system factory test and field debugging, which is conducive to the optimization and quality improvement of nuclear power DCS system factory test and field debugging, so as to the control of construction period and cost.
Key words: Nuclear power plant; DCS; Logic; Test
點擊預覽:核電DCS系統(tǒng)工廠測試與現(xiàn)場調(diào)試邏輯功能驗證方案對比分析和研究.pdf
摘自《自動化博覽》2021年5月刊