作者:王健,王鑫,姚志春(安徽淮南平圩發電有限責任公司,安徽 淮南 232089)
摘要:針對安徽淮南平圩發電有限責任公司三期2×1000MW超臨界燃煤發電機組擴建工程(以下簡稱“本工程”)爐水泵電機多次發生導電頭擊穿放電等故障進行分析研究,通過采取多項可靠性提升改進措施和對策,
徹底消除了本工程爐水循環泵電機存在的缺陷隱患。
關鍵詞:爐水循環泵電機;導電頭;導軸承;定子鐵心;繞組;可靠性提升改進
Abstract: This paper analyzes the accident of series insulation break down of pump motor of Furnace water circulation in Pingwei power plant, which is 2×1000MW ultra-supercritical coal-fired generating unit extension project of Anhui Huainan Pingwei Power Generation Co., Ltd. (hereinafter as “the project”). Several improvement actions have been taken to eliminate the potential risk of pump motor of Furnace water circulation.
Key words: Pump motor of Furnace water circulation; Conductor head; Pilot bearing B; Stator core; Winding; Reliability improvement.
摘自《自動化博覽》2019年12月刊