★北京廣利核系統工程有限公司田博川,劉卿,高連國,孫健,張登超,方國輝
摘要:隨著控制理論與技術的進步,某核電站項目首次采用數字化技術的后備盤(以下簡稱:ACP),使其具有更高的集成度和可靠性,為機組安全穩定運行提供更有效的支撐。其網關采用了虛擬實物模擬,Level2層采用實物模擬的方式,并去除參考機組冗余的硬件設備和網絡架構,具備仿真精度高、通訊集成度高、設備占用空間小、節約采購成本等優點。ACP仿真技術的首次應用不僅可以提高操作員的培訓質量,更能在 日常的課程培訓中將一些隱性問題發掘并反饋實體機組。
關鍵詞:核電站;后備盤;ACP
Abstract: With the process of control theory and technology, the backup panel of digital technology (hereinafter referred to as ACP) is adopted for the first time in a nuclear power plant project, which makes it have higher integration and reliability and provides more effective support for the safe and stable operation of the unit. The ACP gateway adopts emulation, and Level 2 adopts stimulation, and eliminates the redundant equipment and network architecture of the reference unit. It has the advantages of high simulation accuracy, high communication integration, small equipment footprint, and saving procurement costs. The application of ACP simulation system can not only improve the training quality of operators, but also discover some hidden problems in daily course training and feedback the actual unit.
Key words: Nuclear power plant;BUP;ACP
在線預覽:防城港3&4機組ACP后備盤仿真技術的研究與首次應用.pdf
摘自《自動化博覽》2022年第三期